Download Brochure

About the project

Anwa Phase 2 by Omniyat Group offers one to three-bedroom apartments in Dubai Maritime City, positioned directly on the waterfront with views of the Arabian Gulf.

The development occupies a waterfront location in Dubai Maritime City, one of the city's emerging residential and mixed-use districts. Mina Rashid lies five minutes away, whilst Jumeirah Beach, the Gold Souk, Downtown Dubai, and the Dubai Mall are all within fifteen to twenty minutes by car or via public routes. The position combines urban proximity with a sense of waterside repose.

The collection comprises studios and one, two, and three-bedroom apartments, each designed with contemporary finishes and outdoor space. The residences overlook the Arabian Gulf, framing the waterfront as a primary feature of daily life within the development.

Residents have access to a broad range of facilities designed for wellness, leisure, and daily convenience. A gymnasium, yoga studios, and spa services address personal wellbeing. Multiple pools, including one positioned to view the Gulf, dining and retail outlets, and direct access to the Green Loop waterfront park support active living. Children's facilities, outdoor terraces, and barbecue areas complete the provision.

Starting Price

AED 2.10M

Handover

Q4 2026

Payment Plan

60/40

Property Type

Apartment

Bedrooms

Studio, 1, 2, 3

Developer

Omniyat Group

Anwa Phase 2 By Omniyat Group image 1Anwa Phase 2 By Omniyat Group image 2Anwa Phase 2 By Omniyat Group image 3Anwa Phase 2 By Omniyat Group image 4Anwa Phase 2 By Omniyat Group image 5Anwa Phase 2 By Omniyat Group image 6Anwa Phase 2 By Omniyat Group image 7Anwa Phase 2 By Omniyat Group image 8Anwa Phase 2 By Omniyat Group image 9
Anwa Phase 2 By Omniyat Group masterplan

Masterplan

Anwa Phase 2 By Omniyat Group by Omniyat

The development fronts the Arabian Gulf with direct access to the Green Loop and waterfront promenade. Pools, landscaped terraces, and outdoor recreational spaces engage the water's edge, whilst retail and dining facilities are integrated at ground level to activate the community.

Amenities

Swimming pool

Children's pool

Gym

Yoga and meditation

Children's play area

Kids' club

Barbecue area

Rooftop terrace

Restaurants and cafés

Shops

Covered parking

Unit Types

Studio

1 Bedroom Apartment

from AED 2.10M

2 Bedroom Apartment

3 Bedroom Apartment

Download Floor Plans

Location

Maritime City, Dubai

Maritime City is a substantial waterfront development purpose-built for the maritime and marine industries, combined with residential and mixed-use elements. The area spans 249 hectares across six districts and hosts over 280 registered maritime businesses.

  • Dubai Gold Souk: 15 min drive
  • Dubai International Airport: 20 min drive
  • Dubai Mall: 20 min drive
  • Jumeirah Beach: 10 min drive
  • Mina Rashid: 5 min drive

Compare other off plan projects in Maritime City.

Payment Plans

5%

Down payment

55%

During construction

40%

On handover

Project Brochure

Everything you need to know about Anwa Phase 2 By Omniyat Group

Download Brochure

The developer's own brochure, as a PDF.

Anwa Phase 2 By Omniyat Group brochure
Anwa Phase 2 By Omniyat Group - Augusta Properties

Begin Your Property Journey with Us

Share your details and our team will help you find the best property options tailored to your needs.

  • Full details on master plans & amenities
  • Updated availability & floor plans
  • Investment guidance & ROI insights
  • Support with site visits, booking, and documentation

Request a Call Back NowChat with us now

By clicking Submit, you agree to our Terms & Conditions and Privacy Policy.

Useful Information about Anwa Phase 2 By Omniyat Group

Anwa Phase 2 By Omniyat Group is in Maritime City, Dubai, a development by Omniyat Group.

Anwa Phase 2 By Omniyat Group is developed by Omniyat Group, a company founded in 2005.

Anwa Phase 2 By Omniyat Group has apartments with studios and 1, 2 and 3 bedrooms.

Homes at Anwa Phase 2 By Omniyat Group start from AED 2,100,000 (about USD 572K), as of 22 September 2026.

Handover at Anwa Phase 2 By Omniyat Group is planned for Q4 2026.

The developer's payment plan is 5% on booking, 55% during construction and 40% on handover, as of 22 September 2026.

Similar Projects

Handover Q4 2029
Seacrest
Seacrest
Seacrest
8
Seacrest by Damac

Maritime City, Dubai

Apartment

1-3

776+ sq ft

Handover Q4 2027
Bluz Tower
1
Handover Q1 2029
The Forest District
1
The Forest District by Beyond

Maritime City, Dubai

Apartment

1-4

757+ sq ft